Client:
The Executive Engineer (Civil) Civil Construction Circle, 1 x 500 MW Expansion Project, M.S.P.G.C.L., Khaperkheda District Nagpur - 441102.
Salient Features:
- Length of ROB - 796.92 M.
- Viaduct - 2 nos. continuous spans of 95.25 M each (prestressed single cell box girder). Total length = 2 x 95.25 = 190.5 M.
- Railway Portion - 2 spans of 45 M, 12 M wide Open Web Girder(Steel structure) and RCC slab - Composite Steel structure. Fabrication of girder was carried out in RDSO approved workshop and assembling / launching was carried out using heavy duty cranes over running railway tracks in presence of RITES (PMC Consultant) & MSPGCL (Clients).